Oct 30, 2026

Mist Eliminator Replacement RFQ: Dimensions, Drainage and Retrofit Fit

Mist eliminator replacement requires accurate evaluation of element dimensions, gas loading, liquid drainage, support frames, sealing arrangements and separation requirements. This engineering guide explains the differences between wire mesh and vane-type mist eliminators, hydraulic assessment, pressure-drop considerations and common retrofit mistakes. It also provides an EPC RFQ checklist for industrial demister replacement projects.
Oct 30, 2026

Vapor Maldistribution Below Packed Beds: Causes and Design Checks

Vapor maldistribution below packed beds can reduce effective contacting area and compromise distillation or absorption performance. This engineering guide explains the causes, including inlet jets, support grid restrictions, collector geometry and uneven vapor loading. It also covers hydraulic calculations, pressure-drop evaluation, flow redistribution options and EPC engineering data requirements for packed column troubleshooting and retrofit projects.
Oct 30, 2026

Vacuum Distillation Column Retrofit: Managing the Pressure-Drop Budget

Vacuum distillation column performance depends on controlling pressure drop across the entire tower internals system. This guide explains how structured packing, liquid distributors, collectors, support grids and vapor passages contribute to overall pressure loss. It also covers actual vapor volume, flooding assessment, operating conditions and hydraulic calculation requirements for vacuum column retrofit projects.
Oct 30, 2026

Diagnosing Distillation Column Capacity Bottlenecks Before Replacing Internals

Distillation column capacity bottlenecks should be diagnosed before replacing trays or packing. This engineering guide explains how to analyze differential pressure, vapor-liquid loading, flooding, downcomer limitations, fouling, liquid distribution and process operating conditions. It also provides hydraulic calculation considerations and an EPC RFQ checklist for evaluating distillation column capacity upgrades and tower internals retrofits.
Oct 30, 2026

Export Packing and Transport Protection for Fabricated Tower Internals

Export packing plays an important role in protecting tower internals during international transportation. This engineering guide explains how to prevent deformation, surface damage, moisture exposure and component loss when shipping stainless steel trays, structured packing, liquid distributors and mist eliminators. It also covers package identification, container loading, critical hydraulic feature protection and EPC export packing requirements.